Contribution
My Lords, I declare my interest as a freeholder of a mixed-use building, 15 metres tall, constructed in 2018—post Grenfell—in Norwich. Addressing the consequences of the use of aluminium composite materials in pre-Grenfell tall buildings is the priority that the Building Safety Act is meant to resolve and a commitment that should remain undimmed. Unlike my noble friend Lord Young, I will constrain my comments to the effect of the proposed regulations, which are contemplated to be introduced on 1 October, on the construction of new homes, not existing homes. That does not mean I do not care about the existing homes, but I think we need to view part of these regulations through the lens of the construction industry.
It is common ground that we need more homes, driven not only by the UK population, which the ONS tells us is now just shy of 70 million, but because you cannot sell capitalism to people who cannot accumulate capital—and the best way of doing that, for most families, is by building a stake in their own home. Nothing we do should discourage or disincentivise the need to build the homes our nation needs.
There are enough headwinds in construction already and the Minister probably has some of those ringing in her ears from her lunchtime meeting with SME builders. There are more headwinds to come. The BSA levy is potentially one of those headwinds and could chill construction still further at a very delicate fiscal moment. That is important because if there is no building, there is no levy and there is no money to fix the cladding.
We know that there is a crisis of confidence in London’s building industry. I will focus on London for the moment because a lack of housing starts in London is going to imperil the Government’s nationwide housebuilding ambitions. All historic sources on housing starts point to London being in crisis. The Molior data shows that just 2,000 private homes were started in the first half of the year—a record low. MHCLG data shows that the total number of homes started in the entirety of the 12 months to quarter 1 2025 is 60% lower than the previous record low, set in 1990. The GLA’s affordable data shows that only 347 homes were started in Q1—a record low, following lows in 2024-25. Right up to date, the interim statistics show that in the last quarter for London new starts were 40% lower than the previous low point, with nothing over 18 metres started anywhere.
Developers in London are on strike, and if we cannot sort out building in London, we will never get roofs over people’s heads nationally. This is not just about the levy holding things back; house prices have risen in the capital by 1% since 2015, a previous high point. Berkeley Homes tells me that the bill costs have risen by over 40% in the same period—directionally, half on materials and half on regulatory burdens. So we know that viability is under threat. Planning has previously been fingered as the hold-up for development, but now if you get your planning consent, you need to get building safety regulator approval before you start digging foundations for all the dwelling homes that are excluded from the levy. It is therefore the building safety regulator that is putting speed bumps in the way.
These regulations provide for applications to be made to the regulator before 1 October next year or the levy will apply. That sounds like a long way away, but I am told it is currently taking 44 weeks, at best, for the regulator to reply to an application. More often than not, that reply is in the negative. I have heard of a refusal from the regulator that was evidenced by a single word: “Roof”. That is just not good enough. It is already too late to apply and hope for an approval, with just 50 weeks to go until 1 October 2026. That is also not helping many of the thousands of already completed homes in London that are doing nothing but eating their heads off in interest for want of a final approval.
I have done some research and learned that the reasons for all this relate to the fact that staffing and the transition have not been sorted out between the HSE and the building safety regulator. There is far too much subjective interpretation between professionals, each of whom may be correct in their difference of preference, but either option could be safely implemented. The regulator’s IT system is incompatible with the software that all developers use, particularly because it does not use the indexes. That is important because rather than someone going online, clicking on the screen and being transported instantly to one of the thousands of A0 plans through the index, the regulator’s IT system—I am told—means that you have to search manually through all 1,000 sheets. It is hardly surprising that it is taking so long. We then have the numbers: an additional £60 to £70 per square metre in London—and up to £90 in Fulham—and directionally £25 to £35 elsewhere.
I have consulted developers. More than ever, time is money. Reluctantly, they are prepared to accept the levy—that is good news; there is an alignment on the need and the willingness to pay. But their view— I agree with this, and I ask the Minister whether she does too—is that, before the levy comes into play, the building safety regulator needs to sort out its relationship with the HSE. The software needs to be made compatible with BIM, so that we actually get some productivity. We have to agree to objective, accepted standards for what is an acceptable way of building new homes, rather than be subject to arbitrary preference. There needs to be a response within four weeks and not 44 weeks.
If the builders are making that proposal, I think that it is a fair bargain and that the Government should accept it. Unless they do, the developers’ strike will continue and then no levy will be created at all. That does not help anybody, still less the people for whom my noble friend Lord Young is most concerned.
It is important that we think also about the cash flow. I have looked carefully at the regulations and the implementation. I am concerned that, particularly for a large-scale flatted development, should one go ahead, the entirety of the levy—remember, that it is £90 per square metre in Fulham—would be paid on the entire development at the point at which the very first part of that development had a completion certificate. Just at the point at which the developer is suffering greatest cash stress, the entire bill would be due. I am concerned for the cash-flow viability of these organisations, noting that the Financial Times has reported that, in the entirety of London—a city of 10 million people—in the last quarter, fewer than two dozen new flats have been sold. That is a real crisis point.
Will the Minister recognise that until the system is working smoothly, nobody will start anything over 18 metres and that unless we can get the workability, timescales and IT right, the strike will continue? Will she give a commitment that, at the point at which the levy is introduced, approval times will be down to, say, a reasonable four weeks, because time is money and money is risk? On that basis, there will be a grudging acceptance—but an acceptance none the less—by the industry that we can move forward, and then the people for whom my noble friend Lord Young is most concerned can be remediated more quickly. Unless we get an accommodation between the Government and the development industry on going forward positively, this will not be sorted out and the Government will stand zero chance of meeting their ambitious housing targets, which we should all endorse.