Baroness Taylor of Stevenage (Lab)

Speaking in the House of Lords on 15 October 2025

Debate

Building Safety Levy (England) Regulations 2025

Contribution

It is expected to be a reasonable date. We are not going to let people push it forward another 10 years, for example; that would be unreasonable. I note noble Lords’ comments about the insurance industry. We continue to work with the insurance industry on this matter. I understand that this is a difficult issue. The noble Lord, Lord Young, asked about non-qualifying leaseholders; I know that this matter has been a very sore point with such leaseholders. The leaseholder protections were designed to protect people living in their own homes. That is why the threshold was set at ownership of three properties in total: to distinguish between owner-occupiers and those who have made investment decisions. However, there is still substantial support. All leaseholders benefit where a responsible developer has been identified or where the freeholder is or was associated with the developer, and all leaseholders benefit from protections in relevant buildings if it is their principal home. Where no responsible developer can be identified or made to pay, the cladding safety scheme funds eligible cladding remediation for buildings over 11 metres, ensuring that leaseholders do not face cladding bills. The law also allows for the recovery of costs for interim measures and expert reports via remediation contribution orders, placing costs with those responsible rather than residents. Even if some leases are non-qualifying—those for investment properties, for example —a leaseholder’s principal home on 14 February 2022 in a relevant building can still be a qualifying lease and benefit from protections if it meets the statutory criteria. On the issues around construction product manufacturers, the power to charge the levy in the Building Act 1984 do not allow for it to be charged on construction product manufacturers. In February 2025, the Government published the construction products Green Paper, setting out comprehensive proposals for system-wide reform of that construction products regime. We are reviewing consultation responses, including on measures to introduce sufficiently robust sanctions, penalties and liabilities in order to hold economic operators, including construction product manufacturers, to account. The Government are committed to ensuring effective redress for manufacturer failings, whether they are historical or arise in future. The cost of remediation must be shared equitably among those who have profited from or have an interest in the development and construction of unsafe buildings. It is unacceptable that some construction product manufacturers have not yet made a fair contribution to resolving this building safety crisis; I want to be very categorical about that. The Building Safety Act introduced new provisions in Sections 147 and 151 to enable developers, building owners and leaseholders to bring a claim against construction product manufacturers and suppliers where a product has been mis-sold or is inherently defective; Section 149 allows claims for historical defects where cladding products have rendered a building unfit for habitation. These provisions create redress routes where no direct contractual relationship exists. Developers sit at the apex of the industry and are therefore well positioned to take the lead in funding and co-ordinating remediation works. Once they are complete, developers can seek to recover costs from the other parties involved in the supply chain. We are currently reviewing those sections of the Building Safety Act to make sure that the redress routes are robust, support effective cost recovery and promote accountability. We will provide an update on that later this year. On the protection for buildings over 11 metres or five storeys—we have had this discussion before—evidence shows that problems with historical fire safety defects are concentrated in medium and high-rise buildings, where the risk to life tends to increase with height. By contrast, buildings under 11 metres typically present lower risks and can often be managed with other proportionate mitigations rather than remediation schemes. I know that there is a dispute with the insurance industry over that and, as I said, we continue our dialogue with it. Leaseholders in collectively owned buildings are excluded from the leaseholder protections because the freehold is owned by some or all of the leaseholders, and the protections would therefore not have their intended effect. Collectively owned buildings are still eligible for the Government’s cladding safety scheme and the responsible actors scheme, and they can also bring remediation contribution orders against former owners, developers or associated persons. We are committed to reviewing how better to protect leaseholders from costs. The noble Lords, Lord Fuller and Lord Jamieson, raised the pace of housebuilding and its impact. The levy has been designed to minimise potential housing supply impacts while balancing the need to raise the revenue required to make homes safe. All the issues raised with me at the SME round table I attended earlier this afternoon are already being explored and looked at, and I will continue that dialogue with those people. I have undertaken to give them some feedback. Developers have had plenty of notice that the levy is coming and to include it in their viability plans. It was announced in 2021, and developers have had 15 months from being provided with the detailed design until the launch in 2026. Levy measures to minimise the housing supply impact—I mentioned these in my introduction—include variable levy rates at local authority level, the discount on developments on previously developed land, exemptions for affordable housing and developments of fewer than 10 dwellings. We expect that the cost of the levy will, in time, be reflected in the price that developers pay for land. Affordable housing is exempt from the building safety levy, and the Government are unlocking housebuilding at an unprecedented level. We have already taken urgent action through the planning reforms, which we will discuss next week, and through the £39 billion of investment for social and affordable housing. I will make some comments on the building safety regulator because it is really important and noble Lords have mentioned it. Local authorities will administer the levy even when the building safety regulator is the Building Control Authority. The levy has been designed to minimise additional responsibilities imposed on the BSR. On 30 June, we announced a new phase for the BSR, including strengthening the leadership of that organisation, tackling operational challenges and moving it from the HSE to a stand-alone body. The building safety regulator has been open and transparent about the challenges of implementing a significant shift in the way building safety is now regulated in high-risk buildings. The BSR has implemented a range of operational improvements, and it will recruit over 100 new staff to strengthen capacity by the end of the year. Over the past three months, the BSR has made major changes to improve the processing of gateway 2 applications, including a new fast-track innovation unit. Early indications suggest that the new model is working effectively. We expect the model to start to deliver improvements in processing times in the coming months, and we continue to commit to the highest standards of safety. The fast-track process is about refining a new system, not stepping back on commitments. I take the noble Lord’s point about the quality of responses; it is clearly not acceptable to send a response back with just “roof” written on it. I will take that back. His points about digital compatibility are well made. I will take those back and reply to him in writing. On the payment point, I understand that the levy is paid at building control application, and in a major development that would probably be phased, so the building levy would be applied in that phased way. The noble Lord asked for a delay to the introduction, but developers have already had 15 months after being provided with the detail, so I do not think that that would be justified. On the SME point, we are still consulting on the issue around medium-sized developments. I will respond in due course, once we have analysed those responses. The noble Lord, Lord Shipley, asked about reviews. They can be more frequent—the minimum is three years—and there will be a continual review process. We need a balance, providing certainty with an ability to amend in the light of changing circumstances. We will continually keep this under review. In response to his question about PBSA, 30 bed spaces in PBSA are roughly equivalent to 10 dwelling-house thresholds, so that is why it has been set at that rate. In conclusion, we think that the building safety levy is essential to fund the remediation of these historic building safety issues without further burdening residents and leaseholders, who have already suffered quite considerably through all this. The Government are committed to delivering 1.5 million homes to meet the country’s long-term housing needs and to unlock growth. That must work in parallel with our commitment to remedying the building safety failures of the past. The industry that contributed to such problems must pay to remedy them. The draft regulations set out a fair approach to collect the required funds, while ensuring minimal impact on housing supply and industry.

More from Baroness Taylor of Stevenage (Lab)

Other recent Hansard contributions by the same speaker.

About Hansard

Hansard is the official verbatim record of proceedings in the UK Parliament. Every word spoken in the Commons and Lords is recorded and published — this page is a single contribution from that record.