My Lords, I declare my interest as vice-president of the Local Government Association. I thank the Minister for introducing these statutory instruments.
The first of these instruments follows the tragic death of two year-old Awaab Ishak in 2020, a deeply distressing case with which I am all too familiar. My heart goes out to his family, who have been fighting this case for almost five years. Awaab lost his life due to prolonged exposure to mould in his family’s social housing. Awaab’s family and parents did all they could to get the local social housing provider to deal with the problems, to no avail. His death serves as a stark and painful reminder of the devastating consequences that follow when serious hazards in social housing are unaddressed.
This statutory instrument seeks to implement part of Awaab’s law, introduced under the previous Government through the Social Housing (Regulation) Act 2023. It sets time-bound legal duties on landlords to investigate hazards, communicate with tenants in writing and resolve issues within set deadlines.
This is a welcome legal framework, but it begs serious questions. Most urgently, why has it taken so long? When we were in government, our intention was to act, and we were planning to bring in these protections by autumn 2024, following the consultation. At that time, we were already in dialogue with people in the social housing sector, many of whom had proactively begun updating their internal procedures to reflect the law’s requirements. Indeed, in my experience, housing associations and local authorities were already taking steps to improve how they handled damp and mould complaints, introducing clear communication strategies and triaging cases based on vulnerability and risk.
I ask the Minister directly: why has it taken until September 2025 for this instrument to be brought forward, when the tragedy that prompted it occurred in 2020 and the consultation concluded earlier this year? Why have the Government allowed yet another winter to pass without these protections being fully operational?
On 22 October 2024, I pressed the Minister on that exact point. I asked, quite reasonably, when they would introduce the secondary legislation, and I was told by the Minister at the time that regulations would be laid in autumn 2024. Yet here we are, nearly a year later, and the family of Awaab Ishak are still waiting.
My concerns are further compounded by the phased implementation timetable, which delays until 2027 the application of some of these protections to other serious hazards such as excessive cold, heat, fire and poor hygiene. Why must we wait until 2027? Are we really prepared to accept that vulnerable children will spend the next two winters in dangerous houses, exposed to hazards that the Government already recognise as life-threatening?
Again I ask the Minister: why have the Government chosen to delay full implementation by nearly two years, when the sector has already had time to prepare and families cannot afford to wait? I note that, in last year’s exchange, the Minister said that
“we want to get this done as fast as possible. No one should ever have to lose a child because of the condition of their home”.—[Official Report, 22/10/24; col. 511.]
Those were strong and welcome words. But actions matter more than rhetoric, and I respectfully must say that this timeline does not reflect that urgency.
My last question for the Minister on this instrument is: how will the Government ensure that social landlords will communicate these changes to their tenants? If tenants do not know, tenants cannot do anything about it.
Turning to the second instrument before us, on the extension of electrical safety standards to the social rented sector, this too is welcome. It brings social housing in line with the regulations that have applied in the private rented sector since 2020. It requires all landlords, private and social, to carry out electrical inspections at least every five years, issue safety reports to tenants and complete remedial works within 28 days. The inclusion of electrical equipment through in-service testing, formally known as PAT, is particularly welcome and an important step.
However, I must again return to the timeline. The Charter for Social Housing Residents, published in 2020, promised action. A working group was formed and a consultation was launched in 2022, but only now, three years later, do we see regulations laid. I look to the Minister for justification on this.
In closing, I want to reiterate that this is not a question of politics; it is a matter of justice, of decency and of delivering a promise made not just to the Ishak family but to all tenants who have been suffering in silence. I commend the intent behind these regulations, but I honestly urge the Government to show the urgency that this situation demands. I look forward to the Minister’s response.