V

Viscount Hanworth (Lab)

Speaking in the House of Lords on 4 September 2025

Debate

Planning and Infrastructure Bill

Contribution

My Lords, Amendment 107 might appear to be of a technical and specialised nature, but I insist that it is fundamental to the modern methodology of infrastructure planning. I will talk briefly about the problems in planning before dealing specifically with the topic of digital twins. The cost of making detailed plans is cheap relative to the costs of delivery. Good planning increases the likelihood of rapid delivery. With a speedy delivery, the chances are reduced of a project being thrown off course by unexpected events. Overruns of cost and time can be limited by careful planning. One is liable to imagine that recent infrastructure projects in the UK have been uncommonly affected by rising costs and delays, but, as has been mentioned, international comparisons have shown that such experiences are common to many countries. Nevertheless, many of the dysfunctions of project management in the UK can be attributed to the economic nostrums that arose in the years of Margaret Thatcher’s Conservative Governments. During the period in question, the doctrine of outsourcing was widely propagated. It proposed that organisations should concentrate on their core activities, which are the things that they do best, and that functions that had hitherto been performed in-house should be assigned to external providers possessed of specialised expertise. It was proposed that this recommendation should be followed equally by the public and the private sectors. The doctrine of outsourcing has been responsible for many of the problems that have beset the HS2 rail project. It was supposed that specialised contractors could be relied on to undertake both the planning and the delivery of the project. Frequent revisions of the master plan created confusion and delay. The overall direction and co-ordination of the project was the responsibility of a weak and ill-equipped company that was HS2 Ltd. What is required in a major infrastructure project is a firm and detailed plan and the active co-operation of the contractors involved in its delivery. An example of how this can be achieved has been provided by the projects to build the Hinkley Point C and Sizewell C nuclear power stations. One can extol the arrangements at Hinkley C despite the delays and cost overruns that have affected the project. Some of those are attributable to political indecisiveness and some to the misfortune of the Covid pandemic.

More from Viscount Hanworth (Lab)

Other recent Hansard contributions by the same speaker.

About Hansard

Hansard is the official verbatim record of proceedings in the UK Parliament. Every word spoken in the Commons and Lords is recorded and published — this page is a single contribution from that record.

Partner sites