Lord Lansley (Con)

Speaking in the House of Lords on 1 September 2025

Debate

Planning and Infrastructure Bill

Contribution

My Lords, I am grateful to the Minister for being so brief and to the point and for allowing me the opportunity to explain the purpose of the other amendments in this group in my name, which are Amendments 73 to 76. Like the Minister, I look forward to hearing from the noble Earl, Lord Russell, about grid capacity in his Amendment 79. I remind the Committee of my registered interest as chair of development forums in Cambridgeshire and Oxfordshire. My amendments relate to Clause 17, which contains a power to give Ministers the opportunity to designate strategic plans for the purposes of the connection reforms that are taking place in relation to the transmission and distribution networks. I suppose it would be helpful—not least because it will connect to what the noble Earl, Lord Russell, will raise—for me to remind the House that this process is under way. In effect, it was commenced by the Connections Action Plan under the previous Administration in November 2023. A simple way of expressing it is by saying that there was a lot of commitment to future substantial increases in generating capacity in a range of technologies, which were increasingly forming a queue to book their potential connection to the transmission or distribution networks. However, there was considerable risk related to whether those projects would be delivered on time or at all. The volume of such commitments made it very clear that a significant proportion of them would not be viable, because there would be an excess of what was required. The numbers varied, but I think the latest figure was something like 714 gigawatts of grid capacity relative to about 500 gigawatts of demand. Instead of the old regime, which can be characterised as “first ready, first connected”—namely, those who were planning to provide capacity simply booked a place in the queue and then, when they were ready, they were given a right to be connected—the intention now is for there to be strategic planning behind the process leading to the net-zero objectives in 2030, which were published under the Government’s Clean Power 2030 Action Plan last December. Since then, Ofgem and the National Energy System Operator have been working on this. For the avoidance of doubt, references in Clause 17 to the independent system operator and planner, ISOP, are actually to the National Energy System Operator, or NESO. Ofgem agreed on its methodologies, I think in April, and has now, after consultation, approved the processes. I think that we are in a position—but the Minister can correct me if there is more detail—where we are anticipating, potentially in a matter of weeks, the first allocation of commitments by Ofgem to what is known as Gate 2. As I understand it, Gate 2 means that Ofgem will say that it is committed to these projects and that they will be connected to the transmission or distribution networks when they are ready and because they are needed. There are two differences with that approach. First, the queue will be straightforward; it will be not just “first ready, first connected” but “first ready, first needed, first connected”. Secondly, the two criteria that Ofgem will apply, in the first instance, will be that there is a clear timetable—with milestones, which, if they are not met, may cause such projects to lose their place in that queue—and that they will be connected when they are needed. There is therefore a direct relationship between the strategic planning for electricity capacity in a range of technologies and the projects that NESO agrees will be brought in to supply the grid at given times in the future. If I understand it correctly, the present strategic objective is set out in the connections annexe to the Clean Power 2030 Action Plan. It sets out a range of technologies, and capacities that are required in those technologies, and then breaks them down by regions across the country. There is therefore a plan to which the alignment should relate. The Explanatory Notes state that the designated strategic plan according to which the National Energy System Operator should work may be, for example, the Clean Power 2030 Action Plan, so we can see the relationship with that. The Explanatory Notes do not say this, but the Delegated Powers Committee’s memorandum from the department did: in addition, the designated plans are intended to include the strategic spatial energy plan intended to be published in 2026. That is in addition to what is in the clean power plan, which has 2030 targets and ranges for its potential capacity requirements through to 2035, and will extend that to 2050 so that there is a longer strategic alignment between the people who are making substantial investments and the commitment on the part of the grid to take that supply into the grid.

More from Lord Lansley (Con)

Other recent Hansard contributions by the same speaker.

About Hansard

Hansard is the official verbatim record of proceedings in the UK Parliament. Every word spoken in the Commons and Lords is recorded and published — this page is a single contribution from that record.

Partner sites