Tim Roca

Tim Roca

Labour — Macclesfield

Speaking in the House of Commons on 21 May 2025

Debate

Roadworks: Cheshire

Contribution

I thank the hon. Gentleman for raising the point. Constituents mention the issue of night time works to me, but perhaps I will let the Minister comment on that in a little more detail. In Cheshire, we are really lucky to be on the fast track for devolution, which is opposed by local Conservatives. Hopefully, when we get more powers and more money from central Government, we will be able to consider such things in Cheshire ourselves. There has been too little regard for how these roadworks are impacting the public. I have a work experience student in my constituency office from my old school in Poynton, and she says that her mum describes the traffic lights on the bridge as the “bane of her life.” Traffic routinely backs up all the way to Poynton during rush hour, impacting travel in the north of the constituency. One Poynton resident complained to me that trips to Macclesfield, usually a 10-minute drive, can sometimes take up to an hour. An employee of AstraZeneca who commutes in says that every day they see large tailbacks of traffic with frustrated motorists, and all the while nobody is seen to be working on the bridge. Another Poynton resident who works in Macc has had to add 20 minutes on to his journey both ways. He says that the queues start from 7.30 in the morning and are not gone until 9.30, so they are not even possible to avoid with flexible working. Forty minutes a day, 200 minutes a week, equals over 10,000 minutes of him sitting in a traffic jam this year. That is 166 hours away from his family before he can relax—or, heaven forbid, go out for the evening. That is 10,000 minutes per person every day—and it is going up—until the bridge is safe and the traffic lights are removed. Although work sometimes takes place under the bridge out of sight from passers-by, the reality is that no matter how much progress is being made and however earnest the attempts to fix the bridge, this saga has lasted a year. Very little, if anything, took place prior to January and I have had to get increasingly involved with Ringway Jacobs and the highways team at the council. All that is simply not on. Everyone involved owes the residents across Macclesfield’s communities an apology. United Utilities gives compensation to residents if they lose their gas, electricity or internet, even for short periods. Would Ringway Jacobs even be solvent if it had to pay compensation to every driver who has experienced delays? The disruption caused by the traffic lights at Mill House Bridge pales in comparison with the horror that is the B5470. This saga started with temporary traffic lights due to the embankment structure falling away on part of the road; they were in place, causing disruption, for a few months. In January, the difficult and necessary decision was taken to close the road between Rainow and Kettleshulme after it suffered a much larger collapse of both the carriageway and the supporting embankment following heavy rainfall. The road has been fully closed since January, and I have met with the council multiple times since the closure. I have spoken to the leader and conveyed my absolute demand, on behalf of my constituents, that the road is reopened as soon as possible, because the disruption and the impact on them is profound.

More from Tim Roca

Other recent Hansard contributions by the same speaker.

About Hansard

Hansard is the official verbatim record of proceedings in the UK Parliament. Every word spoken in the Commons and Lords is recorded and published — this page is a single contribution from that record.

For Tim Roca's full parliamentary record including voting history, expenses and all other contributions, see the Tim Roca report card.