Tim Roca

Tim Roca

Labour — Macclesfield

Speaking in the House of Commons on 21 May 2025

Debate

Roadworks: Cheshire

Contribution

My hon. Friend is absolutely right. This needs to be resolved as quickly as possible. It is affecting my constituents and his. He has also been working tirelessly to get that road reopened; I thank him for working with me on that. The road closure is impacting real people’s lives. The chair of governors at Kettleshulme primary school told me months ago that the June completion date was totally unacceptable. They said: “We have families who utilise this route who will struggle with timely drop off and pick up of their children. Delivery of our curriculum is now compromised. The bus journey to Bollington for swimming lessons will take over an hour.” As a result, the school has had to cancel swimming lessons. It has also had to cancel its parents and tots sessions, as the facilitator lives in Macclesfield and can no longer get to the school on time. It has pulled out of sporting events. Any collaboration with schools, which used to be easy to organise, now requires a minimum 40-minute trip and a whole host of planning. More seriously, the school has had to stop advertising places to families in Macclesfield because it knows that no parent will sign up for an 80-minute round trip to drop off their children, even at a really good school. A company in Rainow has staff who cannot get to work because of bus cancellations. Not everyone has a car, or the time, to work their way around the road closure. One constituent said to me: “To get to Macclesfield we have to make a huge detour via Bakestonedale Road to Pott Shrigley, then through Bollington to join the A523. We cannot use our bus passes to get to Macclesfield as the bus route is basically severed in two.” Another, who has commuted to Sheffield every day for six years, said: “This road closure is significantly extending what’s already a complex drive.” They also noted that heavy goods vehicles are being forced on to narrow and unsuitable roads. The diversion is not a suitable long-term plan. Bakestonedale Road is a single lane in places, with a steep and narrow track. It is really not suitable, especially in the winter months. It has already deteriorated, with huge potholes forming. Alicia—the head at Kettleshulme—hit one of those potholes recently and, having no phone signal, was forced to walk the rest of the way to school. The diversion is also having an impact on those who live on the roads that are now seeing above-normal use. Keith Nixon, a resident on Shrigley Road, told me that as a direct result of the closure, commuters become frustrated and attempt to make up for lost time. Residents see cars travelling at well over the speed limit; he has suffered near misses twice, with vans passing within inches of him on the pavement outside his house; and of course, there are issues with noise as well.

More from Tim Roca

Other recent Hansard contributions by the same speaker.

About Hansard

Hansard is the official verbatim record of proceedings in the UK Parliament. Every word spoken in the Commons and Lords is recorded and published — this page is a single contribution from that record.

For Tim Roca's full parliamentary record including voting history, expenses and all other contributions, see the Tim Roca report card.