Robbie Moore

Robbie Moore

Conservative — Keighley and Ilkley

Speaking in the House of Commons on 25 March 2025

Debate

Construction Standards: New Build Homes

Contribution

I thank the hon. Member for Sherwood Forest (Michelle Welsh) for securing this important debate. As I said in my earlier intervention, it seems that we have both experienced the challenges of Harron Homes, and she has my full sympathy for having to deal with them. In my own constituency, I had the managing director come out—not that he wanted to, but I managed to get him there—and we had a meeting with residents to talk through some of the challenges. I share the concerns that she raised on behalf of her constituents, because it is not a good housing developer and it does not have its residents’ best interests at heart. Construction standards are not just about bricks and mortar; they go into a home, and they go beyond that, into the sense of belonging that one feels when living in a good quality space. Construction standards are also about the process of planning, site security and development maintenance, all of which play a part in the experience of a resident who moves into a property. I will use this opportunity to talk about some of the challenges that I have experienced in my constituency, particularly in Long Lee. In Redwood Close, a development is being undertaken by Accent Housing Group. I was called to look at the condition of an existing construction site about eight months ago. It is derelict because those involved in the construction went bust, but this is a site that is right in the heart of Long Lee and, dare I say it, has been causing a huge nuisance not only to those who wanted to move into the development and are now experiencing delays, but to those living in close proximity. I was invited along to see the access challenges to this particular site for myself. Neighbouring properties have had boundary walls, drainage and access all disturbed as the result of ongoing, existing construction. It is completely unacceptable. I met again with the director for development, who came out on to the site with me around four months ago and reassured me that things would change at speed. I can tell hon. Members that nothing has changed at all, other than giving me further reassurance and then holding a residents meeting. They have told me that Esh Construction Ltd has now been appointed to complete the works, but those works are not due to start until mid-spring and construction of the site at Long Lee will not be completed until 2026. All the while, those neighbours—who have had their property damaged, access hindered and boundary walls to their properties completely removed, allowing easy access to a dangerous site—have had to live with this right on their doorstep. It prompts the question: what has the local authority been doing throughout this whole process? Bradford council has not monitored the construction, nor has it carried out sufficient enforcement action; indeed, no enforcement action seems to have been taken at all. That is not a satisfactory outcome for the residents in Long Lee.

More from Robbie Moore

Other recent Hansard contributions by the same speaker.

About Hansard

Hansard is the official verbatim record of proceedings in the UK Parliament. Every word spoken in the Commons and Lords is recorded and published — this page is a single contribution from that record.

For Robbie Moore's full parliamentary record including voting history, expenses and all other contributions, see the Robbie Moore report card.