I am grateful for the hon. Lady’s intervention. As the new Liberal Democrat MP for Chelmsford, she demonstrates that this is a cross-party campaign, supported by people who are as committed to decarbonisation as anything else. As has been said, there is no comparable resistance from campaign groups in the north-east of England. That is clear evidence that underground HVDC receives public support, making it a far more practical and feasible solution. In East Anglia, the opposition to overhead pylons is not subsiding; it is growing and becoming more intense. Campaign groups are united in their resistance to this outdated approach to infrastructure. The Government, including the Minister, have made it clear that local campaigners will not be able to block their nationally important mission to build clean energy infrastructure across the UK. We are not blocking; we are trying to help. In my constituency, one local group wrote to National Grid, in response to a consultation, saying: “By all means, build closer to our houses and shorten the route, just put it underground.” That demonstrates that communities are not opposed to infrastructure or the objectives behind it. They are just against bad decisions to achieve it. I mentioned streamlining the planning system to bring it into line with what is required of water companies laying major water pipes. There is a massive underground Anglian water pipe being installed from Bury St Edmunds, across my constituency to Abberton reservoir in the constituency of my right hon. Friend the Member for Witham (Priti Patel). That includes digging a trench through the sensitive landscape of Dedham vale across the Stour valley, almost exactly where the pylons or alternating current undergrounding will go. Nobody is objecting to that underground scheme. I have not had a whimper of complaint about that pipe going in. Why stick to pylons when that method is slower and delays will make it far more expensive? The Government may argue, as the hon. Member for Chelmsford (Marie Goldman) mentioned, that community benefits will compensate for the disruption to affected areas caused by pylons, but those ideas will not buy off the hostility to pylons and other unwanted infrastructure. Solutions that respect communities and their interests, as well as deliver for our energy network, are the future. For Norwich to Tilbury, the onshore undergrounding HVDC proposal will cause significantly less environmental damage than overhead cables and AC undergrounding. Let me expand on that. For a start, the entire route would be underground, not just through the sensitive landscapes. The cable trenches required for undergrounding HVDC cables are far narrower than for AC cables. AC undergrounding is proposed for the area of outstanding natural beauty, the special landscape area that I share with my hon. Friend the Member for South Suffolk (James Cartlidge). That requires a 120-metre-wide trench, because AC cables need to be spaced out. That means a very wide swathe of destruction, as that vast trench is dug and refilled, and everything in its path is destroyed. It is extremely expensive to avoid going through archaeological sites. The Stour valley is an archaeological site of the same importance as Stonehenge. If there had been stones in the Stour valley, we would have a Stonehenge, because there is evidence of a wooden henge. Ancient tribes lived there in prehistoric times and it was a significant area throughout Roman times and the middle ages. All of that is at risk, in addition to the massive destruction of trees, ancient woodland and hedges, in order to install AC underground cables. I am all for mitigating the effect of pylons by undergrounding, but let us not kid ourselves that it is a solution for the most sensitive areas of landscape. It is also much more expensive to underground AC cables than DC cables. I would very much like the proposal to underground cables to be extended to other areas, such as the Roman River valley, which is technically not in the special landscape area but is just as special. The Government have an obligation to respect sensitive countryside, so that could be another cause for a judicial review. A much better solution would be to underground DC, not AC, cables through that sensitive landscape. Another reason why this proposal is so advantageous is that offshore DC to onshore AC requires huge DC-to-AC converters at the cable end points. When DC current generated by a wind farm lands somewhere such as Friston in the constituency of Suffolk Coastal, there has to be a massive DC-to-AC converter for it to go into the AC grid network. If we started building a DC grid network—for example, if energy ran all the way from Norwich to Tilbury on a DC line—all those connections could go straight into the DC network, avoiding the need for extra infrastructure. Incidentally, that would apply to the interconnectors for energy coming from the continent. Electricity arriving from the proposed Tarchon Energy interconnector would be DC, so we would not need a massive DC-to-AC converter at Ardley in my constituency; we could have just one DC-to-AC converter at the point at which the electricity needs to be converted to AC much nearer London—at Tilbury or even the Isle of Grain. It is clear that HVDC is right for many parts of the United Kingdom, not just East Anglia. Wind power stations are increasingly located along the coast or just off our coastline, and a DC transmission network would reflect that. Converting power to AC at landfall is inefficient and duplicative. A properly designed onshore and offshore HVDC network would reduce the infrastructure needed, cut down on converter stations and enable us to focus on building for real demand, rather than just peak production. Globally, HVDC is becoming the standard for modern energy networks. By investing in HVDC now, the UK can maintain its leadership in renewable energy, create jobs and develop skills that will keep us competitive. The alternative is clinging to outdated, mid-20th century technology that will leave us falling behind other countries. Germany will not give up HVDC undergrounding altogether, but that is the presumption in our planning system, which I suggest the Government need to revise. The Government must show decisive leadership and embrace an HVDC future. This is about more than just reducing costs and avoiding delays; it is about ensuring we meet our renewable energy goals in a way that works for communities, the environment, the economy and the planet.

More from Sir Bernard Jenkin

Other recent Hansard contributions by the same speaker.

About Hansard

Hansard is the official verbatim record of proceedings in the UK Parliament. Every word spoken in the Commons and Lords is recorded and published — this page is a single contribution from that record.

For Sir Bernard Jenkin's full parliamentary record including voting history, expenses and all other contributions, see the Sir Bernard Jenkin report card.