Contribution
The hon. Gentleman is right to say that one main handbrake to remediation is national resourcing. There are simply not enough fire safety engineers or specialist companies that can do this remediation work on a fast timescale. That problem exists not only between Scotland and England but within the English regions. I entirely accept the hon. Gentleman’s point that a co-ordinated national solution is the best response we could hope for for our residents, so that the work is undertaken in a timely and efficient manner.
My second question for the Minister relates to that topic. How will those responsible be held to enforceable timetables, so that residents have certainty and transparency from companies completing the remediation works? The examples I have cited concern the pace and conditions of remediation but, before any work begins, someone must decide what work is required.
That brings me to PAS 9980, the framework used to assess fire risks in the external walls of existing residential buildings. The Government have committed to making the standard mandatory for relevant external wall fire risk assessments, but its interpretation will influence the work that is carried out, the funding available and the conditions in which residents are expected to live. A proportionate approach is sensible. Assessors should consider the building as a whole, including its materials, construction and wider fire safety arrangements.
The work undertaken should reflect the risk that the building actually presents, but that approach relies heavily on professional and subjective judgment. Residents need confidence that those judgments are competent, consistent, transparent and properly scrutinised. When assessments of the same building reach different conclusions, remediation can be delayed, funding becomes harder to secure, lenders lose confidence and residents are left wondering whose judgment they can ultimately trust.
There is a particular concern where combustible materials, which would not be permitted on comparable new buildings, are allowed to remain on existing homes. An assessment may conclude that the immediate risk to life is tolerable, but residents could still face higher insurance premiums, difficulty securing a mortgage and a reduction in the value of their property. They may be told that their building meets the required standard, while continuing to feel unsafe and financially trapped.
Royal Artillery Quays clearly illustrates this problem. At this point, I pay tribute to Steve Day, who has been a doughty campaigner for that development and its residents. Many hon. Members might have heard directly from him. Royal Artillery Quays is a large, private residential development in Thamesmead, built by Barratt Homes in 2002, and home to around 1,000 residents. Barratt Homes’s proposed approach there, assessed under PAS 9980, would leave some combustible panels in place, on the basis that the remaining risk is tolerable.
Residents—not unreasonably—remain concerned both about the safety of that approach and its financial consequences. They report that annual service charges have risen from £3,000 to £6,000, with much of that increase linked to insurance. That phenomenon is confirmed by the Association of British Insurers, which in October 2025 reported that buildings remediated only to PAS 9980 may face persistently higher premiums than those remediated to a higher standard. In other words, residents will be paying higher insurance premiums in perpetuity because of decisions that were made not just by this Government but by developers in the past. Some of those residents cannot sell without accepting a substantial reduction in the value of their home. Residents have drawn my attention to a fire safety engineering report that states that leaving the panels in place is
“not the most appropriate fire engineering solution”
for that building. Already there is contestation between the different approaches recommended. Where does that leave residents? The reliability of these decisions ultimately depends on the subjective competence of the people making them.
Will the Minister tell us whether the Government will publish the findings of their audits and reviews of the application of PAS 9980, and what steps are being taken to ensure greater consistency in its use? Where PAS 9980 assessments result in combustible materials remaining in place, how will the consequential impacts on insurance premiums, mortgage availability and property values be assessed and communicated to residents?