Contribution
I absolutely concur with my right hon. Friend that Boxer is a vital capability—even more so, given the training pause that we are now encountering with Ajax—and we need to get Boxer into service as quickly as possible. I welcome the speeding up of that process overall.
Meanwhile in October, the then Minister for the Armed Forces had stated:
“Currently ARES will be fielded to Training Regiments, Armoured Cavalry units and Armoured Infantry units.”
As I said, we have ordered only 93. For reference, in order to reflect the establishment of an armoured infantry battalion, we would need 45 Ares to replace the capacity of the Warrior FV510, notwithstanding how many Athena variants we would need to cover the 511 command variant. Where is the capacity to have vehicles at training regiments and armoured cavalry units? There is no redundancy built into the current vehicle fleet.
The 93 Ares platforms equate to just 23 per battalion with no spare capacity, which is not even enough to replace three rifle companies’ worth of the Warrior FV510 variant. Can the Minister explain what the future establishment of these armoured infantry battalions will be? I appreciate that he will not have that information to hand—I do not think the Army knows yet—but will he write to me and explain how an armoured infantry battalion will be structured using Ares and Boxer?
The demise of Warrior leaves a yawning capability gap that will be difficult to adequately replace without a new IFV. The then Minister for the Armed Forces stated that,
“there is no direct replacement for Warrior”,
and:
“There are no plans to extend the out-of-service date for Warrior beyond 2027, and as such an extension is not under consideration.”
The then Minister also stated:
“As the ARES platform is delivered into service, tactical doctrines will be reviewed accordingly.”
I do not expect the Minister to answer the question or to know the ins and outs of armoured infantry doctrine, but he should raise the question with the Land Warfare Centre, and with the infantry battalions that will receive Ares, to ask them how the platform will be used and what capability will then be lost.
By removing a main armament from the armoured infantry’s firepower we fundamentally change the way that the vehicle is fought. It changes the way the vehicle can move cross-country, effectively removes the option to move in bounding overwatch, and means it can never engage enemy armour. Doctrinally, it turns the armoured infantry into mechanised infantry.
Doctrinally, Ares is more akin to the Mk3 Bulldog. Despite that, the Minister for Defence Readiness and Industry this week informed me that Ares
“is more suitable to be employed in the direct battle, rather than in the close support role”.
Given the glaring absence of a main armament on Ares, I would dispute that assessment, which seems convenient rather than well thought through. Bulldog itself is due to be replaced in 2030, so what progress has been made in procurement of the Patria 6x6?
Crucially, in December, the same Minister stated:
“There are no other platforms within the Army’s armoured fleet which can fulfil the armoured reconnaissance role; Ajax has been specifically designed for this purpose.”
With that in mind, and given that the entire Ajax fleet is grounded for an unspecified length of time pending an investigation by the Defence Accident Investigation Branch, with support from the Army Safety Investigation Team and General Dynamics, can the Minister state how the armoured reconnaissance capability of the British Army is currently being provided given that statement, and therefore what is the deployability of 3rd (UK) Division without any formation or armoured reconnaissance capability, or even the deployability of an armoured battle group from within 3 Div?
The parlous state of the British Army’s armoured capability is on the cusp of being thrust into stark relief by the Prime Minister’s announcement last week that we had committed troops to the multinational force for Ukraine. While any detail on that force structure is currently pure speculation, it was reported by The Times that those troop numbers would not exceed 7,500. On a three-form cycle, that is circa 22,000 troops—the majority of the field army. If they are to be more than a speed bump for the vanguard of the Guards Motor Rifle Brigade, they will need capability that they simply do not have today.
Challenger 3 has no timeline, with manufacturing due to commence only once the tank’s performance has been proven in the demonstration phase. It is not going to appear anytime soon. The Government have no plan for the remaining 140 Challenger 2s that are not due to be upgraded, and not even a promise that the plan will be outlined in the mythical defence investment plan. That is against the backdrop that the defence investment plan is unfunded, with a black hole of somewhere around £20 billion, give or take an Ajax programme budget. There will be cuts, and there will be delays. Out-of-service dates are going to be stretched to their limits. Bulldog is already 63 years old, and I am sure that it is no coincidence that it will be 67 when it reaches its out-of-service retirement date.
The Chief of the General Staff wants to implement the 20-40-40 land warfare concept, of which Ajax is a key part, working in tandem with Project Asgard. That is the capability that could and should provide a continuous on-land deterrent along the eastern flank defensive line, reduce our sensor-to-effector time, and achieve the nebulous tenfold increase in lethality by reducing the kill chain to well inside the sub-seven-minute timeframe that defines the current frontline in Ukraine.
Ajax cannot be scrapped. The Army needs it. There is no plan B, and given that it is a fixed-price contract, scrapping it will save no money anyway, despite Ministers confirming that the Government have sought legal advice from the Government Legal Department. The Government have not even considered a viable alternative option in CV90, and starting that process from scratch will take the best part of a decade before we even see a vehicle, based on current queues.
Put simply, Ajax needs to be delivered, primarily because the Army needs to restore its armoured reconnaissance capability. Additionally, there is a second order effect: confidence. The British Army badly needs to restore faith in Ajax as a platform. For all the negative stories and press, the Army and the Government must work out how to rebuild confidence in their ailing platform. I know what it is to be given kit that I do not have confidence in, and to have to use it on operations and wonder whether it will let me down, or worse. I know that the Minister can sympathise with that view. We must restore faith in the platform, not only for the soldiers expected to operate with it, but for its appeal from an investor and export position.
The long-term future of Ajax depends on the ability of General Dynamics to sell it overseas. The most advanced armoured fighting vehicle in its class should be an easy sell to the nations currently in the process of rearming and upgrading. We have a history of exquisite sovereign capability that nobody else really wants: Challenger 2, Warrior, even the SA80. Each of those has suffered from a lack of development over its life cycle, too often a day late and a dollar short.