Sarah Hall

Sarah Hall

Labour (Co-op) — Warrington South

Speaking in the House of Commons on 18 November 2025

Debate

Flood Risk and Flood Defence Infrastructure: North-west England

Contribution

I absolutely agree; my hon. Friend makes an important point. In September, we came within inches of another major event. The emergency services set up a temporary command post, and we were preparing to evacuate homes again. Then, just last Friday, we had another flood alert, with modelling suggesting that we were heading for yet another breach. Residents can see what is happening: these events are coming closer together and they are becoming harder to predict, but none of that should come as a surprise. I want to be clear that the areas most exposed to flooding in Warrington South are some of the most deprived, with some of the highest levels of disadvantage. They are the least able to shoulder the cost of repairs, the rising insurance premiums or months of disruption. Those communities are hit first and hit hardest, and they deserve the very best protection we can give them, not the uncertainty of waiting year after year for the infrastructure that they should already have had. When I looked at an old Ordnance Survey map from the 1880s, I saw that the land around Dallam and Bewsey was clearly marked as liable to flooding, with mud flats shown across an area that is now full of homes. Much of the housing built in the pre-war and post-war decades went up before anyone talked about climate resilience or long-term hydrology. Those decisions were not malicious; they were just made in a different era. With the kind of extreme rainfall that we are now seeing, those early planning decisions are showing their limits. That history matters—it helps to explain why that area is so vulnerable and why modern infrastructure simply must catch up. Nobody back then could have foreseen the level of rainfall now, but we cannot pretend that those planning decisions are not part of why we are here today. We have a responsibility to respond to the risks that are now so clear. This is not bad luck or a one-off winter; it is a pattern. The storms are heavier, the water rises faster and the ground saturates more quickly. Our infrastructure simply was not built for that pace or intensity of change. People often ask me about dredging, clearing the gullies, reopening canals and maintaining the brooks. Yes, those things matter, and I will always push for better maintenance, but we need to be straight with our residents. Dredging, clearing gullies, reopening canals and cutting back vegetation cannot prevent flooding when we get an entire day’s rain in just a couple of hours. That is the scale of the challenge; no amount of clearing alone can keep the water back. Flood events that used to be rare are now frequent. What used to be a slow rise in water levels can happen in the blink of an eye. The weather has changed, but the infrastructure has not. That is why the Sankey brook flood risk management scheme is so important. It is why I fought to secure the funding that finally allowed the outline design stage to begin. The contract has now been awarded and engineers are progressing the plans. Without securing that funding, we would still be talking about possibilities, rather than the engineers beginning their work. But I have to be honest: in the past, promises were made without a plan and people were let down. I will not repeat those mistakes. Sadly, even now, there are some making big claims about this scheme without understanding how complex it is. It is easy to say what people want to hear, but much harder to follow through and deliver. This is not a fast process and I will not pretend it is, but it is real progress after years of false starts. My constituents are desperate, and they ask me the same question time and again: when will this actually be built? The honest answer is not an easy one. At the moment, construction is not due to start until 2029, with an expected completion date in 2032. For communities that have faced repeated flooding, that is a long wait. They understand that the scheme is complex and that it needs to be done properly, so that flooding is not simply pushed on to other neighbourhoods. But they also need reassurance that the project will not stall again because, right now, we still do not have all the funding required. There is an affordability gap that we cannot ignore. In the north-west, we have already seen schemes fall behind when the funding picture is unclear. We cannot afford for that to happen here. Sadly, we all know that the Sankey brook scheme will not entirely remove the risk of flooding. With more extreme weather and a change in climate, that risk will always be there in some form. What we can do is take every practical step to protect the communities most at risk. We can identify the gaps, strengthen the early-warning systems and put better support in place while the scheme is being designed and built.

More from Sarah Hall

Other recent Hansard contributions by the same speaker.

About Hansard

Hansard is the official verbatim record of proceedings in the UK Parliament. Every word spoken in the Commons and Lords is recorded and published — this page is a single contribution from that record.

For Sarah Hall's full parliamentary record including voting history, expenses and all other contributions, see the Sarah Hall report card.