Ben Obese-Jecty

Ben Obese-Jecty

Conservative — Huntingdon

Speaking in the House of Commons on 12 November 2025

Debate

Typhoon Fighter Sovereign Capability

Contribution

It is a pleasure to serve under your chairmanship, Sir Christopher. I welcome Turkey’s order for 20 Eurofighter Typhoon aircraft. I appreciate that it is good news for the UK, good news for the workers at Warton and Samlesbury and good news for BAE and the future production of GCAP. The Government have confirmed that the Turkish jets are tranche 4 aircraft, with the first of the order due to be delivered to the Turkish air force in 2030. The Government refuse to disclose the number of aircraft that will be delivered each year, but have confirmed that it will not impact our ability to conduct the RAF Typhoon phase 4 enhancement programme or, at the back end of that process, the manufacturing of GCAP. I recently asked the Government what estimate the MOD has made of the contribution of Typhoon jets to GDP. The Minister for Defence Readiness and Industry told me: “The biggest contribution of defence to GDP is peace and security.” While in abstract I share that sentiment, it was not really the answer that I was looking for. Typhoon has been one of the UK’s most successful defence export programmes in recent years, with £1.4 billion in export contributions annually and over £30 billion of value to the UK economy, which is more than double the £12 billion initially invested. The programme contributes around £1.6 billion to the UK economy and helps to preserve our sovereign fighter jet manufacturing capability. Under the NATO Eurofighter and Tornado Management Agency, the industrial subsystem production and workshare agreements across the partner nations arrangements dictate that the UK leads on manufacturing the front and rear fuselage, windscreen and canopy, fin and rudder, engine bay doors, foreplane and a range of major avionics systems, which make up 37% of each Typhoon aircraft. For both UK aircraft and UK-led export orders, final assembly takes place at Warton, where the major equipment components, which have been manufactured in Samlesbury by BAE Systems, are ultimately assembled. To that end, it would be good to know how much the order of 20 Turkish jets will create, given the satellite industries that orbit the final assembly and certification processes. Including the Turkish order, there are 154 Eurofighter Typhoons awaiting delivery across the partner nations of Germany, Italy, Spain and Kuwait. How many of those planes will receive final assembly at Warton? What is the plan to ensure that there is no skill fade in the intervening years? While it would be nice to imagine a Kanban-style lean manufacturing process that sees Typhoons rolling off a production line every few days, these jets take several years to construct. What steps will the Minister take to ensure that those responsible for airworthiness testing and certification are kept current and competent between now and 2029, when the first Turkish jets will be approaching completion? Beyond the order, it is worth addressing what assurances the Turkish have been given about the longevity of the jets. The Turkish air force will not receive the last of the jets until 2035, but the out-of-service date for the RAF is 2040. How will the jets be upgraded after we retire them? How will upgrades be delivered at the Warton and Samlesbury plants when they are focused solely on GCAP? The Typhoon is scheduled to remain in service with air forces across Europe and the middle east until the 2060s. Our four remaining tranche 1 aircraft are based at the Mount Pleasant complex in the Falkland Islands, and I had the pleasure of visiting No. 1435 Flight earlier in the year to better understand their role in air defence and quick reaction alert for the south Atlantic islands. However, the handful of remaining tranche 1 Typhoons have an out-of-service date of 2027. Can the Minster confirm whether these will be replaced with tranche 2 or tranche 3 aircraft? If so, which other squadron will lose a flight? As I mentioned, the current Typhoon fleet—our 67 tranche 2 and 40 tranche 3 planes—has an out-of-service date of 2040, but in a written answer to me on 24 September, the Minister for Defence Readiness and Industry stated: “Typhoon will continue to serve as the backbone of the UK’s Combat Air Force until at least the 2040s.” Can the Minister confirm whether the out-of-service date of Typhoon is 2040 or well beyond that? I recently asked the Government about the scope of the planned upgrades for Typhoon, specifically with regard to the mark 2 European common radar system, defensive aid suites, avionics and weapons. The Minister for Defence Readiness and Industry confirmed that those would be outlined in the forthcoming defence investment plan, which it is rumoured will not be published until December. The upgrade programme is due to take place over the next 15 years—coincidentally, the same as the aircraft’s remaining lifespan. The Minister has previously informed me that the phase 4 enhancement—P4E—upgrade programme is in the system definition de-risking phase of activity, following the system definition contract last year. The full scope of the P4E capability package has not yet been agreed, and without that agreement the programme cannot progress on to the design, development and demonstration phase. With that in mind, it appears unlikely that the P4E programme can be accurately outlined in detail in the defence investment plan. With the best will in the world, we know the Government are not about to pull the trigger on a domestic Typhoon order. We cannot afford them, and they clearly do not fit into the combat air succession plan. Having read the strategic defence review, it is clear to me that Typhoon is seen as an integral part—the backbone, in fact—of our combat air capability, but the MOD clearly wishes to pursue exquisite capability, irrespective of the opportunity cost. The current plan sees a mixed fleet of Typhoon and F-35B. I stress the “B” because, frankly, the announcement on the F-35A is a red herring. We are yet to receive the remaining F-35Bs of the current tranche. The remainder are set to be delivered by March 2026, taking our total to 47, with one written off having fallen into the sea. The mooted 12 F-35As are a straight swap for 12 F-35Bs from the next tranche. Those F-35As were pitched as dual-capable aircraft, and would therefore form part of the NATO nuclear mission. If that is the case, why will the F-35As be assigned to 207 Squadron’s operational conversion unit? Using the planes as a training fleet workhorse does not scream nuclear readiness. How many of the jets will be held at readiness?

More from Ben Obese-Jecty

Other recent Hansard contributions by the same speaker.

About Hansard

Hansard is the official verbatim record of proceedings in the UK Parliament. Every word spoken in the Commons and Lords is recorded and published — this page is a single contribution from that record.

For Ben Obese-Jecty's full parliamentary record including voting history, expenses and all other contributions, see the Ben Obese-Jecty report card.