Early Day Motion·EDM 1126

BRIDGE CLOSURES

11 January 199349 Signatures

Motion Text

That this House is appalled by the unnecessary chaos caused to London by the closure of Battersea and Waterloo Bridges at the same time as lane closures on Hammersmith Bridge; and notes that this chaos could have been avoided had an Authority for London been in place, showing the need for co-ordination in policy which only such an authority can provide.