Early Day Motion·EDM 351

Reopening of the Menai Suspension Bridge

31 October 20245 Signatures

Primary sponsor

Llinos Medi

Plaid Cymru — Ynys Môn

Motion Text

That this House welcomes the news that the Menai Suspension Bridge will fully reopen on Saturday, 2 November 2024 following the completion of the first phase in its refurbishment; notes that the bridge is a vital connection for North Wales, spanning the Menai Strait and connecting the Isle of Anglesey with mainland Wales; further notes that the Thomas Telford designed bridge was the world’s first major suspension bridge when completed in 1826 and is a Grade I listed structure; highlights that the bridge was closed in October 2022 due to the need for urgent repairs; thanks the local community that has been affected by the bridge’s closure; hopes that the reopening will allow local businesses and residents to enjoy the benefits of a fully operational bridge over the festive period; and looks forward to the completion of the Phase 2 repainting works ahead of the bridge’s 200th anniversary in 2026.