Written Question·Ministry of Defence·UIN 49325
Boeing E-7: Repairs and Maintenance
Tabled: 30 April 2025
Answered: 7 May 2025
Named DayQuestion
Mr Mark Francois
Conservative — Rayleigh and Wickford
To ask the Secretary of State for Defence, what the status is of the (a) modification and (b) integration processes for the second and third E-7 Wedgetail aircraft.
Answer
Maria EagleThe modification of the second and third E-7 Wedgetail aircraft continues.The second Multi-role Electronically Scanned Array (MESA) radar is fitted to aircraft two and the third MESA is on site and scheduled to be fitted in June 2025.