Written Question·Department for Energy Security and Net Zero·UIN 35004

Solar Power: Electricity Generation

Tabled: 3 March 2025
Answered: 11 March 2025

Question

Ben Obese-Jecty

Conservative — Huntingdon

To ask the Secretary of State for Energy Security and Net Zero, what the minimum threshold of power generation is for a solar park to meet the standard required for Nationally Significant Infrastructure Project designation.

Answer

Michael Shanks
For a solar park to be designated as a Nationally Significant Infrastructure Project, the minimum threshold of power generation is currently 50 megawatts. Consent for a solar project under 50 megawatts is applied for under the Town and Country Planning Ac...
ⓘ

This is an extract from the Parliament API. Search the full answer on Parliament.uk (UIN 35004) →