M

Member

Speaking in the House of Lords on 1 September 2025

Debate

Planning and Infrastructure Bill

Contribution

77: After Clause 17, insert the following new Clause— “Extension of permitted developmentThe Secretary of State must, within 12 months of the day on which this Act is passed—(a) make provision for the following to be included as permitted development—(i) upgrading of existing electricity lines from single to three phase;(ii) alteration of conductor type;(iii) increase in the height of distribution network supports to maintain minimum ground clearances under the Electricity Safety, Quality and Continuity Regulations 2002;(iv) increase in the distance of supporting structures by up to 60m from their existing position when replacing an existing overhead line;(v) in relation to new connections from an existing line, an increase in nominal voltage to a maximum of 33kV and related increase in pole heights;(vi) upgrading of existing lines from 6.6kV to 11kV;(vii) installation of additional stays supporting wooden poles;(viii) upgrading of existing apparatus, including the increase of capacity of pole mounted transformers, subject to the provisions of section 37(1) of the Electricity Act 1989 (consent required for overhead lines) and the Electricity Safety, Quality and Continuity Regulations 2002 (S.I. 2002/2665);(ix) temporary placement of a line for a period of up to two years;(b) consult on the introduction of further measures for the purposes of enabling electricity distribution network upgrades and reinforcements to be delivered as permitted development.”Member’s explanatory statement This new Clause would expand permitted development rights for upgrades to the transmission network.

About Hansard

Hansard is the official verbatim record of proceedings in the UK Parliament. Every word spoken in the Commons and Lords is recorded and published — this page is a single contribution from that record.

Partner sites