Peter Lamb

Peter Lamb

Labour — Crawley

Speaking in the House of Commons on 18 November 2026

Debate

Brighton Main Line: Croydon Area Remodelling Scheme

Contribution

I beg to move, That this House has considered Government support for the Croydon Area Remodelling Scheme on the Brighton Main Line. It is a pleasure to serve under your chairmanship, Mr Efford. The Brighton main line has been a significant area of focus of mine for about a decade. I am grateful for the support offered by my hon. Friend the Member for Croydon East (Natasha Irons)—in whose patch the remodelling works are supposed to take place—during the two and a half years for which we have been in this place together. The Brighton main line is one of the most significant stretches of rail in the entire country. Roughly a fifth of all journeys in the UK take place along the line each day, and it acts as, essentially, the only direct rail link running the whole way through the north and south of London. The line plays a vital role for the many commuter towns along the route, enabling people to get to work each day. It provides the main public transport connectivity for two of the UK’s major airports, and without it much of the south would lack any direct rail connection with the city, and vice versa. Unfortunately, the very success of the line puts its future at risk. Despite covid and the shift to greater home working, the use of capacity on the line during peak hours has now reached pre-pandemic levels. In a little over three years’ time, the line will run out of capacity completely. People will be simply unable to get on trains. This will have an enormous impact on the economy of the sub-region, which is one of the strongest in the country, and on the quality of life of all those who rely on the line as a means of transportation. This issue has not crept up on us; I and others have been raising it for roughly a decade. We have known for years that capacity on the line was running out. Although longer trains with additional carriages and a few other minor improvements can buy us some time, the only way to resolve the capacity issue is for large-scale remodelling works to be undertaken to resolve the current pinch point at East Croydon. Despite initial setbacks, we successfully secured, through the work of the Brighton Mainline Alliance, a commitment from the Department for Transport to undertake the improvements, and the land assembly and planning works began. Yet it was not to last and, alongside High Speed 2, the works became another victim of the Sunak Government’s railway cuts—a fact many of us remained unaware of for a very long time. That decision was enormously short-sighted. The works may need to take place in London, but the scheme benefits services that run from Brighton all the way to Cambridge, Bedford and Peterborough, with connecting services covering much of the south-east and east of England. The project is about the full length of the Greater Thameslink growth corridor and the economic risk to the United Kingdom. The Government have announced, with great fanfare, the expansion of Gatwick and Luton airports, the securing of Universal Studios UK, and the construction of new towns such as Tempsford, all of which fall within the Greater Thameslink growth corridor, and all of which depend on an increase in rail capacity along the Brighton main line.

More from Peter Lamb

Other recent Hansard contributions by the same speaker.

About Hansard

Hansard is the official verbatim record of proceedings in the UK Parliament. Every word spoken in the Commons and Lords is recorded and published — this page is a single contribution from that record.

For Peter Lamb's full parliamentary record including voting history, expenses and all other contributions, see the Peter Lamb report card.