My Lords, I welcome the Minister’s positive reply. There are some 200 wind farm sites coming up for operational termination by 2030—some 3 megawatts of power. If we managed to repower those, we could have an additional 2 gigawatts without having new sites. That clearly makes sense. Will the Government strengthen the planning guidance for repowering, as the Minister has indicated, because that gets in the way, and will he integrate repowering into the strategic energy spatial plan? It is obvious—come on, let’s do it.