E

Earl Russell (LD)

Speaking in the House of Lords on 16 July 2025

Debate

Electricity and Gas (Energy Company Obligation) (Amendment) Order 2025

Contribution

My Lords, from these Benches we generally support the draft regulations. We commend the stated commitment of this Government to deliver warm homes that are cheaper to heat and to tackle fuel poverty. We have some of the highest energy bills and some of the coldest, dampest and worst-insulated homes in Europe. Cold homes not only waste energy and contribute to global warming needlessly but cause problems for people on budgets and low incomes and with ill health. We generally welcome the warm homes plan in the spending review, with its ambitious £13.2 billion of investment, and the crucial steps towards reducing our energy bills and strengthening our energy security. We particularly welcome the rollout of solar panels, heat pumps, batteries and insulation. We particularly welcome several targeted practical changes introduced by this draft instrument, targeting those in need of most support. The most significant change allows 75% of the energy suppliers’ £1 billion Great British Insulation Scheme target to be met through the reassigned ECO4 delivery pathway. This appears to be a pragmatic approach. The Explanatory Memorandum clarifies that this is necessary because the GBIS would otherwise have severely underdelivered, and this is seen as the way to maximise savings and get this done. Further, it reassures us that this will not increase consumer bills, as it is using existing funds and will be a good means of reassigning support and continuity in the ECO4 supply chain. This is considered better value for billpayers, as ECO4 is cheaper to contract. We welcome the flexibility to enable greater allowance of installation measures, especially for low-income households. We welcome the plans to encourage the uptake of smart meters, and we welcome the updating of technical standards. I have just a couple of questions for the Minister. A lot of previous schemes have not quite delivered as intended. Indeed, even here, a scheme that would have underdelivered is having its resources rolled into a new scheme. So, specifically how will this new programme be monitored to ensure that it actually works and delivers in practice, and does not fall foul of some of the issues that have plagued past schemes? The Minister spoke about the issue of quality control with past schemes. I very much welcome the fact that 90% of that work has now been done—that is a tremendous achievement. But, again, under this new scheme, how will we make sure that the quality of the work delivered for households is up to the standards that we require and does not cause any further problems? The Minister said that the Government are planning to bring forward larger-scale reforms for the warm homes plan. Is the Minister able to say anything more about that today or will we just have to wait for that? We recognise that allowing the 75% of the ECO4 delivery for GBIS targets is pragmatic, but what measures will happen with the remaining 25% of the GBIS target? I do not want that bit to be forgotten about, so how will the Government set about making sure that that is delivered and that those houses are not forgotten about? How do the Government plan to report on the delivery of this new scheme and make sure that it is delivering? How will the Minister report on the uptake of smart meters under this scheme? We recognise the measures that are being taken to encourage consumers to do that and that the Government are using the contact through the insulation measures to do that. Generally, we welcome what the Government are doing here.

More from Earl Russell (LD)

Other recent Hansard contributions by the same speaker.

About Hansard

Hansard is the official verbatim record of proceedings in the UK Parliament. Every word spoken in the Commons and Lords is recorded and published — this page is a single contribution from that record.

Partner sites