It is a pleasure to speak with you in the Chair, Mrs Barker. I thank my hon. Friend the Member for Chichester (Jess Brown-Fuller) for securing this important debate. I also thank my hon. Friends who have spoken already, particularly my hon. Friend the Member for Witney (Charlie Maynard)—noting that the sewage effluent that he referred to as such a plague on his constituency flows straight down and into mine.
The relationship between planning and critical utilities is simply broken. In areas like my constituency, where there is substantial house building and employment growth, it is a huge issue. I want to take hon. Members back to September 2024, when we in Oxfordshire experienced one month’s rain in one day. In Bicester, Kidlington, Woodstock, Bucknell and Cassington, people were suffering incoming foul water that not only polluted but contaminated their homes, requiring them to move out for periods of upwards of six months and leaving them with a terrible legacy. I urge the Government to reconsider how to ensure that key infrastructure is built first before new developments open, because this is essential for existing residents and new homeowners.
Other hon. Members have mentioned this, but let us look at how things work now. In my area, Thames Water will be consulted, but it is not a statutory consultee, so any objections or difficulties it raises do not stop the progress of developments. However, as other hon. Members have said, under the Water Industry Act 1991, Thames Water has a statutory obligation to connect both foul and potable water.
What does that mean? It means that, as a standard condition, the developer must either create new capacity off site or improve or build new capacity on site through a dedicated private facility. That is a real issue in my area because sometimes that is simply not possible. For example, the Oxford sewage treatment works are at full capacity. That has the real possibility of delaying the connection of 4,400 homes that are currently being built near Kidlington, or, in the case of my residents in Woodstock, at the development at Bens Close.
I want to take hon. Members back to almost exactly a year ago. I was shaking a bucket along with the firefighters of Woodstock and their supporter Claire, collecting for Children in Need, and the heavens opened. Claire was one of the residents who had seen her property flooded in September 2024, and she was traumatised, knowing that very heavy rainfall might flood her home again. She stayed and carried on collecting for Children in Need, and I discovered later that evening that her home had flooded yet again, along with her neighbours’, like Genevieve. This is an unsustainable and unacceptable situation because they suffer from the fact that their water connection, which Thames Water has installed, is not adequate to deal with both the surface and foul water drains, so every time it rains very heavily, they have water backing up into their homes as well as surface water flooding directly into their houses.
Finally, where it is proposed by a developer to install a septic tank, as it is for my constituents in Enslow, all too often those septic tanks are poorly installed by developers in a rush; they service a community without adequate supply and through management company failings, residents in Enslow have been left with a noxious smell for a long period because of the poor maintenance of the septic tank. In all three of those examples, we have evidence that the failure to include the objections of the water companies at the time of development is creating real difficulties.
I would like to address the comments made by the hon. Member for Edinburgh East and Musselburgh (Chris Murray), whose area I know well—although I have not picked up sewage from the beach, I have certainly spent time there. He made a powerful case for the need to involve developers early, but the point I would like to make to the Minister is that we are in a broken cycle. When the water companies are not consulted automatically when they are obliged to connect, despite not having the ability to do so, and when, as with the forthcoming challenge in Kidlington, they are therefore unable to allow people to occupy the homes, then the local authority loses its five-year housing land supply and is obligated to allow more speculative development in areas that have no infrastructure whatsoever. Although the aspiration of involving developers early is good, it is not sufficient if the water companies are not involved early in the conversation.
I want to close by making the point that it is not just water. I realise that water is the focus of this debate, but the same thing applies to electricity, as the Minister is well aware. Members will forgive me if this is something of a preoccupation, but the asylum centre proposed in my constituency has neither potable nor foul water nor electricity, and the fact that neither the water authority nor the electricity board was consulted means there will be a real challenge in connecting that facility.
To conclude, I hope the Minister will be able to explain how the Government are seeking to ensure that we have an infrastructure-first approach so that residents like those in my constituency of Bicester and Woodstock can have greater confidence in the quality and sustainability of their homes in the future.