E

Earl Russell (LD)

Speaking in the House of Lords on 27 October 2025

Debate

Planning and Infrastructure Bill

Contribution

My Lords, in this group of amendments on the EDP consultation process, we are broadly in support of Amendment 87, tabled by the noble Baroness, Lady Coffey. We appreciate Amendments 163 and 163B, tabled by the noble Lord, Lord Banner, but we have rather more care in relation to these and will ask some questions about them. Amendment 87 strikes us as a sensible and necessary clarification, seeking to require local planning authorities to have regard to an EDP relevant to the land in question. It closes an important procedural loop between the Bill’s new environmental mechanisms and the Town and Country Planning Act. I will move on to the other amendments, as I do not think that Amendment 87 will be pushed to a vote. With Amendment 163A, we are entering more complex territory. Having listened to the noble Lord’s speech, I know that his amendment is intended in relation only to large developments. However, this amendment seeks to allow developers to use an EDP after development has commenced. This is a fundamental change to how the Bill was originally drafted. Although this amendment and the next one are short, they would have profound impacts on the nature of the Bill and the reasoning behind it. Given the late stage that we find ourselves in, it is worth treating these amendments with a degree of cautious scepticism. I have a number of questions on these amendments, particularly as I understand that the Minister might be intending to support them to some extent. I understand the reasoning behind them. Projects evolve, impacts manifest late in the process and developers may wish to regularise matters through this pathway. Indeed, in principle, a degree of flexibility can be helpful for all concerned in the planning process. This could also help to speed things up, which is one of the core intentions of the Bill. However, flexibility, if poorly secured and accounted for, risks turning things instead into loopholes and could give the Government much more direct power and say over matters of importance. EDPs were created precisely to ensure that environmental protection is front-loaded, assessed, integrated and approved before the first spade hits the ground. If we are now to permit post-commencement plans, we are blurring that critical line. The Government clearly set that out in the original drafting of the Bill, so this is a very fundamental change. Might this invite retrospective justification of impacts that should have been avoided or evaluated in advance, and what is the mechanism that will stop deliberate misuse of this new clause should a developer be so minded to do that? How will post-commencement EDPs preserve the same environmental rigour as those agreed at the outset of the drafting of this Bill? What safeguards will ensure that the flexibility serves better compliance, not convenient regularisation after the fact? How will this affect the deterrent from starting work without proper authorisation? The credibility of EDPs and public trust depend on certainty that environmental obligations cannot be adjusted once the bulldozers roll in. This could increase uncertainty for developers themselves. For all the talk of streamlining, shifting assessments mid-project can introduce delay, legal risk and even greater reputational exposure.

More from Earl Russell (LD)

Other recent Hansard contributions by the same speaker.

About Hansard

Hansard is the official verbatim record of proceedings in the UK Parliament. Every word spoken in the Commons and Lords is recorded and published — this page is a single contribution from that record.

Partner sites